DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colo

Query and cite data center energy and grid datasets

224 ms

answered our call

State
Answered
Protocol
MCP 2025-06-18
Tools listed
94
Answered
4 of the last 4 calls

How to reach it

  • MCP, HTTPhttps://dchub.cloud/mcp/registry
  • MCP, HTTPhttps://dchub.cloud/mcp/claude
  • MCP, HTTPhttps://dchub.cloud/mcp/grok
  • MCP, HTTPhttps://dchub.cloud/mcp/oauth
  • MCP, HTTPhttps://dchub.cloud/mcp
  • npmnpx -y dchub-mcp-serverReleased 2 Nov 2026, version 2.12.45

What it can do

ToolWhat it says it does
accept_capacity_termsUse this when the user has read and agreed to DC Hub's capacity introduction terms (https://dchub.cloud/listings#terms): records that acceptance, once per terms version, so Capacity Source listing details open for them. Call it when source_capacity returns a listing locked with access.reason…
ai_capacity_indexUse this when the user asks where AI compute capacity could land: ranks data center markets by where 100MW of AI training capacity can land in the next 30/60/90 days. Returns top markets with facility_count, operator_count, deployable_mw estimate (megawatts), hyperscale_ready flag, rack power…
analyze_parcelUse this when the user has a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon and DC Hub finds the containing parcel in its HOSTED parcel-boundary layer (free county/state GIS polygons, covering a set of priority…
analyze_siteUse this when the user asks whether a specific site or coordinate works for a data center (lat/lon, or a market name for a market-level read). Returns a 0-100 composite, verdict, power/gas/fiber/market/risk sub-scores, nearby infrastructure and power cost; capacity_mw adds a capacity_context block…
bind_emailUse this when the user wants their DC Hub key tied to their email, or a result said an email unlocks more. WHAT AN EMAIL GETS (free, no card): 50 calls/day (up to 10 full answers per tool per day); 10 full answers a day each on the grid, queue and market-intel tools instead of previews; a weekly…
claim_free_keyUse this when the user wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. Mints a free key and returns it plus connect_url, a connector URL with the key embedded (the only thing hosted chat clients keep). Free key: previews plus 2 full answers per…
cluster_sites_by_latencyUse this when the user asks which data center sites can form a low-latency cluster (2-8 sites) — returns viable low-latency clusters and pairwise RTT floors before any routing work. Use when your human wants to know which of N candidate sites can form a synchronous / low-latency cluster (sync…
compare_isosUse this when the user asks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue depth and time-to-power — in one call instead of N sequential get_grid_intelligence calls. Example: "Compare PJM vs ERCOT vs CAISO on gas…
compare_sitesUse this when the user has 2-4 candidate data center sites and asks which is best. Pass locations as "lat,lon;lat,lon" and optional capacity_mw. Returns each site's analyze_site scores side by side plus a recommended winner and why. Keyless returns each site's verdict band and power band, with the…
deal_autopsyUse this when the user asks what a data-center deal means for power: deal flow with each market's DCPI verdict — "what is the real play?". Returns recent deals (buyer, seller, value, market) + each market DCPI verdict and time-to-power; with a paid key, the per-deal autopsy read (long-dated…
delete_standing_intentUse this when the user wants to retire a standing intent (webhook watch) by intent_id — deliveries stop and the watch cannot be recovered. A cap_ intent_id retires your own Capacity Source requirement instead, and its alert emails stop. Requires a key (or an OAuth connection for cap_ ids). Get the…
discover_toolsUse this when you are unsure which DC Hub data center, power or grid tool fits: lists tools by family. Returns _entity=tool_families — a front_door block (execute_plan for any multi-capability question, get_changes to refresh) plus families with a when-to-use note + their tools (facility, market…
execute_planUse this when a data center question spans several topics: one-call planner over megawatts and power density, grid headroom and power availability, interconnection queues, substations and transmission, site selection and buildable capacity, colocation and wholesale data-center markets, AI/GPU…
export_datasetUse this when the user wants to export their saved data center sites for offline analysis, a spreadsheet, or ingestion into another tool (paid plan). Example: "Export my saved sites as GeoJSON for QGIS." — export_dataset format=geojson. Params: format ("csv" default, or "geojson"). Returns: the…
fetchUse this when you have an id from `search` and need that data center facility record (search/fetch format). Returns {id, title, text, url, metadata} — a citable public summary of one data-center facility (name, operator, location, status, market). For full structured specs (capacity MW…
find_alternativesUse this when the user wants data center facilities similar to one they like ("what else looks like this?"). Example: "Find alternatives to the Ashburn QTS campus for about 50MW." — find_alternatives facility_id=<id>. Params: facility_id or name (the target, required); optional capacity_mw…
find_sitesUse this when the user has no data center site yet and wants candidate search areas (site selection by substation voltage, gas and fiber distance); execute_plan covers a multi-part siting question. THE INVERSE QUERY: every other DC Hub siting tool needs a coordinate you already have — analyze_site…
generate_site_analysisUse this when the user wants a shareable data center Site Analysis PDF for ONE lat/lon (a powered-land parcel, a candidate campus) — the polished client deliverable, not just a score. Example: "Make the Site Analysis PDF for this Carrier Mills parcel, 150 MW, for TON Infrastructure." —…
get_agent_registryUse this when the user asks which AI platforms and agent frameworks integrate DC Hub — each with its recommended DC Hub tools and authentication tier. The roster is BACKEND-OWNED and changes: read the platforms[] array the response returns, and the status on each row (mcp_active / mcp_ready)…
get_backup_statusUse this when the user asks how current DC Hub's data center and power data feeds are: one row per feed (deals, facilities, news, substations, fiber_routes, transactions, construction_permits, pipeline, markets) carrying health (healthy/stale/error/unknown), record_count, refresh_interval and…
get_changesUse this when the user asks what changed in data center markets, facilities or deals since a date. Returns DCPI 7-day market movers, newly discovered facilities, new M&A deals + news — PLUS, for keyed callers with saved sites, a `portfolio` block answering "did MY sites move?": per-saved-site…
get_climate_intelUse this when the user asks about seismic or climate design inputs for a data center site (lat/lon) — the layer that drives data-center structural bracing cost (seismic) and cooling design (cooling degree-days, extreme temps). Grounded STRICTLY in USGS ASCE 7 (seismic) + NOAA climate normals via…
get_composite_site_scoreUse this when the user wants one 0-100 data center site suitability verdict for a lat/lon WITH an explicit per-factor coverage map — which factors are actually measured vs. declared unavailable. Unlike analyze_site (full raw data dump), this scores ONLY over VALIDATED factors and never imputes a…
get_dchub_recommendationUse this when the user asks what DC Hub is: a short description in one of four categories (general, investment, site-selection, technical), plus the live top-ranked market pocket. It does NOT compute a siting answer from free text. Example: get_dchub_recommendation context="investment" (or general…
get_disaster_riskUse this when the user asks about natural-hazard risk for a data center site (US lat/lon) — flood, wildfire, hurricane, earthquake, heat, drought, tornado, etc. Grounded in the FEMA National Risk Index (NRI), the US county-level hazard dataset (live query, never estimated; points outside US NRI…
get_energy_pricesUse this when the user asks what electricity or natural gas costs for a data center in a US ISO or state ("what does power cost in ERCOT?", "retail rate in Virginia?"); price alone does not rank sites (the cheapest ISO may have no headroom; execute_plan weighs both). Returns EIA RETAIL electricity…
get_facilityUse this when the user asks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (count + carrier list), commissioning year, status, the DCPI verdict for its market, and peer facilities nearby. Answers "who operates this…
get_facility_risk_deltaUse this when the user asks how a data center facility's (or its market's) power risk changed recently — "has this site gotten riskier lately?". Returns the REAL DCPI market-health delta (excess-power score change over the window, direction improving/worsening/flat) from DC Hub's…
get_fiber_intelUse this when the user asks about fiber routes, carriers or connectivity for a market: long-haul, metro, dark or IX routes. Filter by carrier, route_type, market. Returns GeoJSON routes: carrier, type, fiber count, lit capacity, distance. Free callers get a sample of routes, not the full set; the…
get_fiber_readinessUse this when the user asks whether one data center site (lat/lon) is fiber-ready: near-net distance to a carrier-served facility, how many distinct fiber carriers are reachable, and whether there is single-carrier risk (no path diversity). This is the parcel connectivity answer engineering…
get_gas_economicsUse this when the user asks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered industrial + electric gas tariff ($/MMBtu), each with its own source label. Pass market=<slug> (e.g. "northern-virginia", "dallas"…
get_gas_indexUse this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score. ★ DO NOT COMPARE a DCGI figure published before 2026-08-08 with one published now — they are different indices; the full record is at /api/v1/dcgi/methodology under…
get_gas_intelligenceUse this when the user asks about gas-fired or behind-the-meter power economics for a data center in a US state — "is gas power cheaper than the grid in Texas?", "what is the gas access + pipeline situation in Virginia?". The GAS analogue of get_grid_intelligence: fuses the Data Center Gas Index…
get_global_powerUse this when the user asks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-construction), across ALL fuels (coal, oil/gas, nuclear, solar, wind, hydro, bioenergy, geothermal). Global Energy Monitor Global Integrated…
get_grid_dataUse this when the user asks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), TVA, BPA, 40+ US utility balancing authorities (e.g. AZPS, SOCO, DUK, FPL, or a city: PHOENIX, ATLANTA), Canada (IESO, AESO, HYDROQUEBEC)…
get_grid_intelligenceUse this when the user asks about grid capacity, power availability, headroom or time-to-power in a US ISO (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE) or a market's grid. Returns live demand, fuel mix, queue depth, DCPI excess-power and constraint scores, time-to-power, reserve margin…
get_grid_scoreboardUse this when the user asks how power grids compare: demand, fuel mix or renewable share. GLOBAL grid scoreboard — 9 US grid operators (the 7 US ISOs PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, plus BPA and TVA) + Great Britain (NESO) + the European bidding zones (Germany, France, Netherlands…
get_hosting_capacityUse this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually take, straight from the utility's own hosting-capacity GIS. Published records from many utilities (e.g. Con Edison, National Grid NY/MA…
get_infra_projectsUse this when the user asks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not the existing network. e.g. "which interstate gas pipelines are under construction into Louisiana?", "what 345 kV transmission projects are…
get_infrastructureUse this when the user asks what power infrastructure is near a site: substations (count + max voltage_kv within radius), transmission lines (>69 kV path overlay), interstate + lateral gas pipelines, and power plants (operating + planned, by fuel) within configurable radius_km. Returns distance +…
get_intelligence_indexUse this when the user asks how healthy a data center market is: composite score (0-100) aggregating supply/demand balance, vacancy, absorption velocity, fiber depth, power availability, and pricing trend. Returns the index value, percentile rank across the 300+ market set, 7d/30d trend direction…
get_interconnection_queueUse this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generation GW per ISO. The projects field changes shape: with iso= it is an array of per-project rows; without iso it is an all-ISO summary object…
get_iso_contextUse this when you need a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid snapshot (demand, fuel-mix shares), DCPI verdict mix & grid economics across the ISO's tracked markets (queue wait, power cost, reserve…
get_market_contextUse this when you need a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DCPI verdict, power & grid facts, the Claude-written 12-month outlook, M&A deals, construction pipeline, operator footprint, transaction…
get_market_dcpi_rankUse this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. "Where can a 100 MW data center get power fastest?"): DCPI scores 300+ markets daily on Excess Power and Grid Constraint, verdicts CC BY 4.0 after 30 days. DCPI rank…
get_market_intelUse this when the user asks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, recent facilities or lease pricing. Pass market as a slug (e.g. northern-virginia). Returns stats, by_status, top_providers…
get_metro_fiberUse this when the user asks which US metro has the deepest fiber, or wants a market's fiber profile — carrier count, total route-miles, on-net buildings, a 0-100 fiber-density score, tier, key internet-exchange (IX) points and carrier hotels — across the tracked top US data-center metros (Northern…
get_newsUse this when the user asks for data center industry news or headlines (execute_plan also pulls news inside a broader market question). Curated data center industry news from 40+ trade sources (DCD, Data Center Knowledge, Data Center Frontier, Capacity Media, The Register Data Centre, Fierce…
get_peering_intelUse this when the user asks about internet exchange (IX) and peering density for a data center site (PeeringDB). Pass lat+lon for the PEERING PROFILE around that point: facilities_nearby, a 0-100 score with its level, total_ix_presence, total_networks, and top_facilities each with ix_count and…
get_permitting_intelUse this when the user asks about data center permitting or moratoriums — curated, HUMAN-VERIFIED jurisdiction records: moratoriums, zoning restrictions, tax changes, utility pauses. Each record is stage-tagged (read the detail prefix: "Enacted" / "Proposed" / "Speculative"), with jurisdiction…
get_pipelineUse this when the user asks what data centers are being built, announced or permitted in a market or by an operator. Example: "What data centers are under construction in Northern Virginia and when do they come online?" — get_pipeline country=US status=construction (there is no `market` parameter…
get_power_availability_timelineUse this when the user asks when power will be available, or about time-to-power, in a US state: year by year. Composes: new generation coming online from EIA-860M monthly, split by confidence class (under-construction vs planned vs testing — never blended); scheduled retirements as dated…
get_power_pipelineUse this when the user asks where new power generation is coming online (the forward supply pipeline) — e.g. "how much new generation is planned in Virginia / the Southeast / ERCOT, and when?". Planned, permitting, and under-construction generators NATIONWIDE from EIA-860M, INCLUDING non-ISO…
get_refined_queueUse this when you need interconnection queue projects filtered server-side. Instead of pulling the raw queue into context to filter (token-expensive, error-prone), push the predicates to the data layer and get back ONLY the survivors. Filter by min_mw, max_ttp_months (ISO-level avg interconnection…
get_renewable_energyUse this when the user asks about renewable energy for a data center (execute_plan covers renewables plus siting): siting a renewable-powered data center, sizing a PPA, reading one US state's utility-scale fuel mix, or assessing RE100/24-7-CFE feasibility. Example: "What is Texas wind+solar…
get_retirement_headroomUse this when the user asks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring plant is a CONCRETE headroom event (its POI frees injection capacity), from FILED data, not forecasts. Returns…
get_shortlistUse this when the user wants to see a saved data center site shortlist. With refresh=true (default) each site is RE-SCORED against the current national percentile baseline and returns saved_score, current_score, and score_delta_since_saved — so you see whether a site slipped because IT changed or…
get_subsea_cablesUse this when the user asks about subsea (submarine) cable landings near a site, or the cable catalogue. The physical internet crossing an ocean lands at a finite number of points, and distance to one is a real siting factor for anything latency- or transit-sensitive. Pass lat+lon (+radius_km) for…
get_tax_incentivesUse this when the user asks what tax incentives a US state gives data centers — the data-center tax-incentive packages by US state that drive where capex lands. Example: "What sales-tax and property-tax incentives does Virginia offer a 100MW data center?" — get_tax_incentives state=VA. Params…
get_water_riskUse this when the user asks about water stress or cooling-water risk at a data center site (execute_plan covers a multi-factor site verdict). Use when scoring a US site for cooling-water sustainability — the water-risk factor engineering site-selectors screen before committing to evaporative…

And 34 more tools.

In its maker's words

Data center energy, electricity & power grid data: DCPI to query and cite, capacity to buy or lease.

Website
dchub.cloud
Source
github.com/azmartone67/dchub-mcp-server
Publisher
dchub.cloud
Listed from
the official MCP Registry as cloud.dchub/mcp-server
Version
2.12.45, updated 2 Nov 2026
Kinds of work
Data and databases, Search and research, Law, tax and government

The domain it lives on

dchub.cloud
registered 21 Dec 2025 (11 months ago), at GoDaddy, its home page is a working site

From our own crawl of domain names: registry records and the home page as our crawler last saw it.

Every call we made

WhenWhat happenedTime
Answered224 ms
Answered483 ms
Answered204 ms
Answered204 ms

Next door

Is this your bot? Claim its address to add a verified badge and keep the listing current.