Critical Path Partners

Forensic P6/XER scheduling analysis for claims

2356 ms

answered our call

State
Answered
Protocol
MCP 2025-06-18
Tools listed
13
Answered
3 of the last 3 calls

How to reach it

  • MCP, HTTPhttps://mcp.criticalpathpartners.ca/mcp

What it can do

ToolWhat it says it does
claim_workbench_evidence_ledgerForensic claim workbench — analyzes a folder of mixed evidence (XER chain + MSG/PDF/DOCX/XLSX correspondence) and produces a unified workbench dashboard. Built from the real-world workflow where forensic delay analysis starts from a folder…
collapsed_as_builtCollapsed As-Built / But-For analysis on a post-impact XER. Implements AACE RP 29R-03 §3.8 Modeled / Subtractive / Single Base method (paired with MIP 3.3 Windows for the dual-method gap report per SCL §11.5). Validates a forensic windows analysis…
concurrent_delay_matrixBuild the per-window x per-party concurrent-delay attribution matrix from a chronological list of XER snapshots. Implements the per-window concurrency view per AACE RP 29R-03 §3.3.I (apportionment) and §4.2 (concurrency). Where…
critical_path_validatorCritical-path validation, logic health, and DCMA-14 assessment of a Primavera P6 schedule. Runs the CPP critical-path validator: checks for false criticality, constraint-driven CP segments, open ends, broken logic, and surfaces a DCMA-14 block with…
dcma14_health_checkFull Schedule Health Dashboard HTML report — DCMA-14 + CPLI + BEI + variance/slip register against the baseline. Wraps the CPP Schedule Health Review skill, which produces a self-contained ~1.3 MB HTML dashboard. The dashboard renders DCMA metrics…
forensic_windows_analysisRun forensic windows analysis (AACE RP 29R-03 §3.3, MIP 3.3 Observational / Dynamic / Contemporaneous As-Is) across multiple Primavera P6 XER snapshots and return the full analysis dict. This is the headline forensic tool — it computes per-window…
monte_carlo_p50_p80Monte Carlo Schedule Risk Analysis — P10/P50/P80/P90 completion-date forecast for a Primavera P6 schedule. Implements an AACE-style quantitative SRA (the same math as CPP's browser Tool_11 Portfolio Risk Engine, scripted Python counterpart). For…
path_explorerLogic-trace driver-chain explorer — answers "WHY is this activity critical?" and "WHAT does it drive?". Traces driving predecessors backward from a target activity to project start (the "why critical" chain) and/or driving successors forward to…
qramm_maturityQRAMM-aligned maturity reading for an SRA result. Places a Schedule Risk Analysis run (from ``monte_carlo_p50_p80`` or any equivalent dict) on the five named maturity levels of AACE RP 122R-22 (Quantitative Risk Analysis Maturity Model), section 3…
slip_velocityPer-window slip velocity & acceleration trend across XER snapshots. Computes three signed metrics per window from the underlying forensic windows analysis: - slip_velocity_days_per_day: completion shift / window duration (positive = slipping…
time_impact_analysis_fragnetTime Impact Analysis (TIA) — prospective fragnet insertion into a pre-impact baseline schedule. Supports two modes. **Single-base mode** (legacy): supply ``baseline_xer_path`` or ``baseline_xer_content``. All fragnets are inserted into the same…
woet_classifierWorked-vs-On-time Execution Timeline (WOET) per-activity day-by-day classification of as-built execution against baseline. For each pairable activity (matched by ``task_code``), classifies execution into 4 day-states: - PROGRESS: work performed…
xer_parserParse a Primavera P6 XER file and return a TABLE SUMMARY (not the full row-level data — XER row dumps explode the MCP context window). For each table in the XER, returns the table name, field list, and record count. Per-row data is intentionally omitted — for…

In its maker's words

Forensic scheduling MCP for Primavera P6 (XER): AACE windows, DCMA-14, Monte Carlo, TIA.

Website
criticalpathpartners.ca
Source
github.com/danafitkowski/cpp-cpm-engine
Publisher
danafitkowski
Listed from
the official MCP Registry as io.github.danafitkowski/cpp-cpm-engine
Version
2.10.12, updated 22 Oct 2026
Kinds of work
Law, tax and government, Health and science, Other work

The domain it lives on

criticalpathpartners.ca
registered 30 Aug 2025 (1 year ago), at Register.ca Inc.

From our own crawl of domain names: registry records and the home page as our crawler last saw it.

Every call we made

WhenWhat happenedTime
Answered2356 ms
Answered2753 ms
Answered771 ms

Next door

Is this your bot? Claim its address to add a verified badge and keep the listing current.